Tuesday, June 8, 2010

Surface Mine Planning

Principles and sequence
What is to be mined and when ?

A Surface Mine (Planning, Design, Operation)


Why so fancy shapes ?


Mine Planning Process
1. What do we plan for?
* Planning goals
2. What are the planning targets?
* Outcomes of planning process
3. Planning stages
* Sequence of activities

Sample Planning Goals
1. Maximize NPV, ROR, Payback
2. Provide stable cash flow patterns
3. Uniform grade, grade decline or highgrading
4. Uniform or favorable stripping ratio
5. Uniform / stable (or required) ore tonnage
6. Other….. to comply with company goals???
a. Lowest cost producer?
b. Mine the best 320 mt over 20 years?

What Are Your Goals ?
1. First, clearly define the goals to be achieved! They are site specific!
2. Communicate !!!!
3. Make sure that
a. All are familiar with the goals, and
b. These are understood and agreed to!
4. Periodically review your goals
a. Company’s management, goals, situation changes!!!

Planning Outcomes: Targets
1. Tonnage (volume) to be mined
TONNES
2. Grade to meet the plant requirement
GRADE
3. Cost and economics
DOLLARS

Quantity To Be Mined : Tons and Grades
1. Define how much material is to be mined and from where:
a. To achieve the objectives at the lowest cost
b. To size facilities and estimate capital expenditures
2. Do you mine several different materials?
a. Ore, waste, partings, etc.

More Than That !!!!
a. Time consideration
b. Sequence consideration

Time Component
1. The defined tonnes (or tons, bcm, bcy) need to be mined within a certain time frame
a. Continuity of operation
b. Need for advanced development
c. Impact on cash flow
2. Compare CAT’s FPC
a. Unit cost may be a trade-off for time

Sequence Component
1. Mining needs to follow a sequence
2. Define and pay attention to the best sequence of mining
a. Opening or box cut?
b. Waste to be stripped in advance to allow mining of ore
c. Which waste need to be stripped ???….

Degree Of Detail
1. Everything changes!
a. Location, quality and quantity of ore
b. Prices for your product(s)
c. Costs
2. Long range plan:
a. Little detail, rough estimates
3. Short range plan
a. All the detail, detailed & accurate estimates

Planning Period
1. Life of the mine plan: to ultimate pit limit
2. Long range: five to then years
3. Budget: one year plan
4. Short range: monthly and quarterly plans
5. Production schedule: weekly and daily

DOLLARS - GRADES - TONNES

Note This:
1. Customize your planning system to correspond to
a. The need for information
b. Availability of data / information
c. Cost of developing the information
2. Planning systems and terminology differ from site to site
a. … and between the countries?



Mine Planning Sequence
1. Geologic Model
2. Economic Model
3. Pit Limits (LRP)
4. Pushbacks
5. Mining Schedules
6. Detailed mine plans and optimization studies

Mine Planning : 1st Step
Geologic ore body model

In: Results of exploration
Out: grades, tonnes, geometry, rock properties ……

Geologic Ore body Model

Stage 1: Outcome
Information on:
1. Existence, location, properties and quality of mineralization
2. The same for other materials within your property
3. Variety of other geologic information

Can one trust a geologist ?

Mine Planning: 2nd Step
Economic ore body model

In: Geological model, dilution, recovery, costs, prices, other
Out: Block values

Geologic or geological?

Example of Inputs
…. Required at this point:
1. Topography and geographical features
2. Ownership of the land, mineral rights, etc.
3. Other limits on pit boundaries (rrds, structures, etc.)
4. Inventory of environmental conditions & requirements
5. Estimate of costs: mining, processing, smelting, selling, etc.
6. Geological & geomechanical properties mat’ls to be mined

Step 2: Outcomes
1. Quantity, location and value of ore contained within the deposit
2. Quantity, location and cost of removal of other materials

Mine Planning : 3nd Step
Long Range mine plan (LRP)

In: economic model, mining restrictions (slopes, mining widths, other)
Out: Optimum (economic) pit limit

Floating cone (example)


LRP Goal: Pit Limits


Example of Inputs
…. required at this point
1. Regulatory approvals: what agencies are involved?
2. Production targets / goals & life of mine
3. Type location and cost of facilities and projects
4. Overheads: admin., facilities, services ….
5. Inventory/availability of resources: financial, technical, human

Step 3: Outcomes
1. Economic pit limit:
* Rate of return, other financial criteria
* Tons and grades (but no detailed schedule)
2. Physical pit limits
* May be different from economic ones

Mine Planning: 4th Step
Mine Life & Pushbacks

In: Size & location of deposit, pit limits, mining restrictions, “nested pits”, preferences …
Out: Stages in mine life

Stages, cutbacks, pushbacks, phases ….
Pushbacks



Step 4: Outcomes
1. What is the potential value of the mine
2. Where to start mining
3. What and when is to be mined
a. Not much detail; round figures only
b. Changes many be needed as the scenario changes

Mine Planning : 5th Step
Short range plans = production schedules

In: (a) Long range plan, updated geologic model; (b) Production requirements (t, %), equipment capacities, geotechnical restrictions, other
Out: sequence of mining

Example of Inputs
…….. required at this point:
1. Current status of the mine
2. Scheduled working time
3. Equipment availability, utilization, reliability and productivity
4. Mill / ore / coal recipient requirements
5. Human resources by skill / craft / profession
6. Availability of contractors and other external support available

Step 5 : Outcomes
1. Details of
a. Who mines what?
b. When?
c. How?
2. Resources and revenues are of lesser importance at this stage

LOOP BACK AT EACH STAGE to the economic model, LR plan, budget
1. Updated mining and other costs
2. Updated prices and receipts
3. Updated pit limits
4. Updated production rates
5. Updated environmental, regulatory and other requirements
6. Other updates: admin, eng’g, etc.


Grade Cut-Off

a. What is it?
b. What is is used for?
c. Grade cut-off curves and their uses.

Grade Cut-Off Or cutoff grade ?
A pessimist
The grade at which the mineral resource can no longer be processed at profit, or….
An optimist
The minimum grade at which the ore can be processed at profit.
A break-even grade ?

Cut-Off Grade Calculation

a. Plot of grade vs. net ore value is a straight line
b. Need to calculate the net ore value at two points and
* plot the grade-profit line
* define the equation of this line
c. Example: consider a copper deposit…..

Problem (Hustrulid and Kuchta, pp. 373 and following)

a. Calculate net profit at 0.55 and 0.35% Cu
b. Consider saleable copper obtained from 1 t of ore and define its value
c. Consider technology: recoveries at all stages lower the amount of copper
* Mill, concentrator, smelter, refinery, other
Consider all costs:
* Mining, milling, concentrating, smelting, refining, transport, sales

Do we want to include overheads ? Fixed costs ? Main office costs ?

“Sidetracking”
a. Not always do we produce the final product
* Sell a copper concentrate to Japan? Trona mine?
b. But we need to know “cash value” of product for BEG
* Cash value: all costs, fixed and variable, incurred in cash
* Include cost of refining smelting even if done by others
c. Sometimes we have by-products
* Example Bingham Canyon: Cu, Au, Ag, +++
* Related credits deducted from gross cash costs

Grade Cut-Off


Steps In Defining Each Point…
a. Define the profit (loss) per tonne of ore
b. Do the same for another ore grade
c. Construct a net value vs. grade plot
d. Determine the cut-off grade
* Cut-off grade is where the line crosses “0 profit” line

How does the stripping ratio fits here?

What Goes To The Mill ?

Grade Cut-Off vs. Stripping Ratio

Grade – Tonnage Curves
What is that ?

Grade – Tonnage Curves


Another Example


Grade-tonnage curves
a. Define the relation between tons of ore and the grade cut-off; usually:
* The lower the grade, the higher the tonnage
* The higher the grade, the lower the tonnage
b. Consider accuracy of grade / tons estimates
c. Allow for optimization of cut-off grades
* Higher grade means small mine and mill, little product
* Low grade means more capital cost but more product
d. Remember: cut-off grade is a function of changing economics!


Monday, June 7, 2010

ULTIMATE PIT DEPTH

a. How to determine the optimum depth of a surface mine?
b. What does it depend on?
c. What has an impact on it?



a. SR measures the relative depth
b. Stop mining when you stop making money
* Value of ore (UVO) is equal or less than the sum of:
* cost of mining (UCM),
* cost of waste removal (UCW), and
* “other costs” (UCO)

ESR = [UVO - (UCM + UCO)] / UCW

c. Interpretation:
* how many units of waste can be removed for each unit of ore before you stop making money


What Are “Other Costs”

a. Costs borne in relation to this property
* Cost of discovery and exploration
* Or cost of acquisition
* Permitting and other costs
* Cost of infrastructure and development

b. Minimum acceptable profit
* Shareholders expect a return
* Consider that you have other alternatives in relation to spending money

SR: Definition of Pit Limit


Slope Angle & Pit Limits


Interest Rate & Pit Limits


SR & Underground Mining Cost


SR & Open Pit Mining Cost


Note: Mining Cost Changes!


So,…

How deep / far will
we mine this one?

What is the value
of ore?

Does grade has
to be considered?



a. Unit cost of surface mining is
* Waste at $1.50 per ton
* Ore at $2.00 per ton
b. Unit cost of underground mining is $15/ton
c. Unit value of ore is $20/ton
d. Other cost of mining (“profit”) are $2/ton
___________________________________________________________
Define the depth at which u/g mining should be considered
Define the depth at which you should stop mining

Other Considerations
a. BESR and ESR depend on economics
* unit value of ore
* unit cost of mining waste, ore, other
b. Economics do change
c. The results are valid only if these changes are insignificant
d. Significant changes must trigger re-evaluation of the deposit

Sunday, June 6, 2010

STRIPPING RATIO (S)

a. Types and definitions
b. What does a SR measure ?
c. What to use the SR for ?

On Terminology

1. Overburden O/B
2. Coal / ore
3. Interburden (or parting), I/B
4. Waste

Sometimes:
Waste = O/B + I/B
(look at the context)
Waste (O/B + I/B) needs to be removed to get access to coal / ore

What Is Stripping Ratio ?
a. Measures relative deposit depth

Q: How important is depth in surface mining?
* Consider Chuquicamata at 850 m depth, SR = 0.5
* Consider Capital Quarries , Rolla, at 25 m depth, SR = 0.5
b. To surface mine we need to remove some waste in addition to ore / coal
c. SR measures how much waste needs to be removed so that a unit of ore/coal can be mined
* This means “relative depth”



Geologists vs. Miners
a. How do the Geologists measure SR?
* Look @ sections and measure thickness of waste and ore / coal
* Express SR the ratio of thickness, eg: m/m, ft/ft
b. How do the miners differ
* We know that the slopes are not vertical
* We calculate the amount of waste that needs to be removed to get an amount of ore/coal 

Miners Only ….
a. SR measures the amount of waste that needs to be removed to get an amount of ore, just as we mine it.
Note the “amount”!
b. This will differ depending on time span under consideration
* Initial studies (feasibility) – overall stripping ratio
* Current month – incremental stripping ratio

What is an “Amount”?
Depends…..
a. Coal miners measure waste in BCM, or bcy, and coal in tonnes or tons
* Thus in coal SR is the number of BCM of waste that needs to be removed to uncover 1 t of coal
* Some applies in other bedded deposits
b. Ore miners measure both waste and ore in tons or tonnes. Definition of ore/waste changes!
* Thus in ore SR is the number of tonnes of waste that need to be removed to uncover one tonne of ore

More Complications
a. Units in use differ between countries
b. Each country uses its own units to define stripping ratios
* Consider McIntyre Coal: BCM/long tons
* What is a long ton? Some coal & iron ore trades internationally in long tons!
* Consider Bingham Canyon: tons / tons
* Consider Rheinbraun: BCM/ tonnes




Uses of Stripping Ratio
a. Definition of pit limits
* At what SR can we still make money
* Unit value of ore minus cost of ore AND waste mining gives us profit or loss estimate
b. Production scheduling
* Mine the areas with low SR first
* To maximize cash flow
c. Definition of mine feasibility / profitability
* Rough economics if no better data available

Incremental or Overall SR ?
a. Most evaluations / plans are done based on incremental stripping ratio
* The initial money was sunk already 
* Of concern is what it would take to get that extra tons
b. Overall SR used in early evaluations of mines
c. Overall SR is normally “capitalized”
* What does that mean?
* Does the Taxman have something to do here?

“MOTHERHOOD STATEMENT”
If you work in a mine, ALWAYS use incremental stripping ratio
Use overall stripping ratio only on capital projects

SURFACE OR UNDERGROUND ?
a. Which type of mining is better for your deposit?
b. If it is surface mining, when do you stop mining?

A Brief Summary
a. Surface mining is much cheaper
* may result in more profit, but……
b. Surface mining requires (most often) waste removal
* waste removal cost money and lowers profit
c. Break even point exists at which both surface and u/g mining are equally (un)profitable
* Remember the “Motherhood” statements?
d. Stripping ratio allows definition of this “breakeven” point

Switch to underground mining if your stripping ratio is more than BESR

a. May or may not be economically feasible
* Consider value of ore
b. Major expense/effort is required to switch
* Major capital expenditure: how to handle this?
* Is there enough ore left to pay for the switch?
* Do we have expertise to mine underground?
* Are there other opportunities to make more $$?
c. A decision may be made not to mine underground even if it would be profitable



Break Even Point: Discussion
a. Cost of mining – you control it! 
* Relative difference between underground, surface
* Relative difference between ore, waste
b. Economics usually determined by:
* Geology of the deposit
* Compare: Escondida mine, Chile vs. a Kansas quarry
* Efficiency and effectiveness of mining methods
* Economic considerations:
Interest rates, discount rates, other

REFRESHER ON COSTS

a. What costs do we incur to mine?
b. Unit cost of mining
c. Cost of surface vs. underground mining

Motherhood Of All Statements
a. We mine to make money (a reminder)
b. The lower the cost of mining, the better chance that we will make money
c. We need to make sure that our costs are as low as possible
* Mine in the way that allows you to minimize your cost

Capital vs. Operating Costs
a. Capital costs, a “one time” expenditure
* Do development work
* Acquire equipment and plant, etc.

b. Operating costs, an on-going expenditure
* Pay for your manpower, supplies, etc.
* Sometimes called “cash cost”


Capital Costs
a. Large impact on initial cash flow
b. Important tax implications
* Not a one-time write-off - has to be depreciated at a prescribed rate (is this always bad)
* Most important at the beginning of mine life
c. Higher capital cost usually means:
* Higher production rates
* Lower operating costs
d. “Sunk Cost” later in life of the mine.

Operating Costs
a. Define efficiency / competitiveness of your mining operation
* You want it to be in the lowest quartile, or better
* Determine size of “working (or operating) capital”
b. Usually split into two:
* Direct cost - directly related to tons mined
Examples: drilling, blasting, loading, transport
* Indirect cost – does not depend on tons mined
Examples: engineering/mg’t, admin., facilities, etc.

Cost of Unit Operations
a. Each mining operation consist of unit operations:
* d&b, excavation, transport, processing….
b. Each unit operation has a site-specific cost, related to a unit of material mined
c. Cost of unit operations depends on:
* How efficiently you perform them
* Material properties and and other mine-specific factors

Unit Operations’ Costs: An Example
All costs in $/tonne, unless marked otherwise



Unit Cost Of Mining
a. Cost per unit of production
$/ton, $/tonne, $/BCY, $/BCM
b. Considers only the operating cost
c. The best measure of your
* Effectiveness
* Efficiency
* Competitiveness

Unit Cost of Mining: An Example
(after Crowson: Inside Mining. Cumulative gross cash cost of copper mines in 1993a)



MATERHOOD STATEMENT
Unit cost of surface mining is much lower than that of underground mining



Why The Difference?
a. Smaller equipment (excavation envelope)
* Lower productivity
b. More specialized equipment
* More expensive, more maintenance
c. High fixed costs
* Expensive development, services
d. Additional unit operations
* Roof control, ventilation, other….
e. Safety considerations
* Compare accident rates
f. Inflexible production schedules
* Difficult to change, expensive & time consuming development

MATERIAL PROPERTIES

This lecture reviews the most important properties of mined materials

1. Material Density
The mass (weight) per unit volume of material.
a. The denser the material, the more weight there is per unit of equal volume.
b. Density of mined material varies greatly:
* iron ore insitu @ 6,000 lbs/BCY or 3 t/Bm3
* coal insitu @ 1,800 lbs/BCY or 1 t/Bm3
c. Sources of information
* field measurements
* handbooks for rough estimates only


2. Material Swell
a. When broken, material swells
b. Swell results in lower density of broken (loose) material

NOTE: loose density is always less than insitu (bank)

c. Swell depends on the type of material and on its size (how well broken)
d. Where to get the values from :
* field measurements
* handbooks for rough estimates
Typical swells: from 15% (sand) to 50% (rock)

Note This:
When describing the quantity of material

ALWAYS STATE IF LOOSE OR BANK

* loose cubic yards, LCY
* bank cubic yards, BCY
* loose cubic meters, LCM or lm3
* bank cubic meters, BCM or bm3
10% penalty for not following this rule in class assignments

Swell Factor (SF)
a. Defines the change of density or volume when material is broken (fragmented)
b. Defined in two different ways:
* based on change of density per unit volume; thus SF<1; sometimes used in America
(note CAT “load factor”)
* based on change of volume per unit of mass; thus SF>1; common elsewhere
c. Where to get the values?
Field measurements Handbooks?

Swell factor: density change

SF = 1 / (1 + % swell)
for swell of 30%

SF = 1 / (1 + 0.3) = 0.77
that means:

lbs/LCY = SF x lbs/BCY
lbs/BCY = (lbs/LCY) x 1/SF

Swell factor: volume change

SF = (1 + % swell)
for swell of 30%

SF = (1 + 0.3) = 1.3
that means:

lbs/LCY = (1/SF) x lbs/BCY
lbs/BCY = SF x lbs/LCY

Angle of Repose
a. The property of loose material that is related to its cohesion
b. Defines the free piling angle if the material is heaped
c. It is not a pit slope angle, unless the slope is excavated in loose material
d. It is a dump slope angle, a stockpile slope angle
e. Where to get the values from:
* insitu measurements
* handbooks for rough calculations

Fill Factor

a. We seldom load the equipment to its nominal volumetric capacity
* loading/hauling equipment match
* material properties: angle of repose/surcharge
* digging forces, material fragmentation @ the like
b. Fill factor needs to be defined for each job & material
c. Typical values:
* insitu job studies
* handbooks for rough estimates only

SF & AR: Mining Implications
a. Mine dump volume (LCY) is LARGER than the excavated pit (BCY)
* Know swell to properly plan and design mine dumps, waste disposal facilities, etc.
* Know swell to plan/design material stockpiles
b. Volume of transported material is more than either that excavated or dumped
* Know swell to properly size the mining equipment

Buzzwords
a. Bucket, bowl, box, tray, other?
b. Swell factor
c. Angle of repose or angle of surcharge?
d. Bank volume, loose volume
e. Bucket fill factor

Sources of information:
a. Local experts
b. CAT Performance Handbook
c. SME Mining Engineering Handbook

Thursday, June 3, 2010

Pujaan Hatiku

test... upload file...
sekalian mau mencari pendapat tentang suaraku... hehehe... Maaf, jika suaranya ancur...

Aku kan menunggumu...
dan akan selalu menantimu...

dalam setiap khayalku...
kau selalu hadir menemaniku...

Kau di hatiku...
Kan menjadi pujaanku...

Aku kan menunggumu...
dan akan selalu menantimu...

Tenangkan hati dan jiwaku...
dan biarkan semua berlalu...

Kau di hatiku...
Kan menjadi pujaanku...
Aku ingin engkau...
Selalu hadir di setiap mimpi-mimpiku...


atau mau langsung download sebuah karya percobaanku... ahahahahaha....