Friday, February 11, 2011

Clean Coal

NEW WAYS TO COMBAT GLOBAL WARMING

Clean coal-burning energy technology is set to move into the industry mainstream, propelled by new technology developments, important strategic alliances and changing economic circumstances. Some energy industry executives are beginning to lay the groundwork now for a series of coal-gasification plants that would come online by 2010 and beyond. Most of these plants will utilize Integrated Gasification Combined Cycle (IGCC) technology, which combines coal gasification and combined cycle techniques to provide superior thermal efficiency and lower emissions than do traditional coal-burning plants. That could dramatically transform the coal industry’s competitive landscape and place an unexpected financial burden on utility executives tied to traditional coal-burning plants. Such facilities are less expensive to build and operate now, but they may not be by the end of the decade when new, cleaner technologies move to the coal industry’s forefront.

Utility companies, such as Cinergy, American Electric Power and others, are already getting behind IGCC, which cold provide them a strong early competitive edge if the technology meets its potential. “I’m optimistic that the time is right for IGCC,” says Bob Moreland, general manager of analytical and investment engineering for Cinergy. 

“The driver is that we think this is the way to go to build up our baseline energy capacity.” Cinergy’s PSI Energy along with General Electric Co. and Bechtel signed a letter of intent to study the feasibility of constructing an IGCC generating station that would produce 500 to 600 megawatts of energy to help meet increased demand during the next decade. The study is expected to be completed early in 2005, when a formal contract could be signed. GE and Bechtel are developing a standard commercial offering for IGCC projects in the United States. IGCC proponents view this as a key breakthrough because the standard offering will streamline the planning process, bring down costs of plant construction and minimize the financial risk of utility companies considering IGCC. Previously, the utilities had to separately arrange and contract for each phase of IGCC plant development. “The fact that GE is trying to put this together is very attractive to Cinergy,” explains Moreland. “A utility doesn’t have to buy all the bits and pieces and try to put an IGCC plant together itself.”

CLEAN COAL BENEFITS
IGCC proponents believe the technology, if successful, would reaffirm coal as the clear king of the energy landscape in the United States. They see the technology delivering economically viable, cost-efficient, environmentally sound energy for decades to come. “IGCC seems to be the best option with the most flexibility,” says David Hadley, an Indiana utility commissioner who chairs a commission exploring clean coal alternatives. “There has been a real change in thinking over the last 18 months among utility executives. They are increasingly aware of the environmental issues surrounding the use of coal. It (IGCC) is more economical than retrofitting an existing (coal) plant, potentially.”

Andrew Spahn, director of grants and research for the National Association of Regulatory Utility Commissioners, notes that more than 100 base loan unit coal plants have been planned during the next four years. He figures IGCC technology could make such plants economically and environmentally feasible because the energy produced is almost as clean as natural gas. “We are going to be building coal plants, regardless,” Spahn says. “If you can build them cleanly, it makes the economics of coal more affordable and cleans up the air.

CHANGING MARKETS
External developments also play a role in the rise of IGCC. Worldwide natural gas shortages and rising oil prices are combining to make coal a more attractive option, especially in the United States where there is an abundant supply. 

Furthermore, a clean coal-burning ICGG plant costs only between 10 and 20 percent more to build than a traditional coal plant - not terribly prohibitive when energy executives factor in likely future prohibitions on CO2 and other emissions, as well as the cost of retrofitting existing coal plants. Finally, large companies such as GE, Bechtel, Fluor, Peabody Coal and others are taking a close look at IGCC and developing a cookiecutter approach to design and engineering that is driving development costs down.

The U.S. Department of Energy, meanwhile, is pushing a Clean Coal Power Initiative to create commercial-scale demonstrations of proprietary technologies designed to improve emissions from coal-fueled electric generating plants. This is also fueling a renewed interest in clean coal. One such grant for nearly $20 million was given to Peabody Energy Corp. to build an ultra-clean $500 million coal power plant in northwestern New Mexico. 

Construction is expected to take three to four years, but Peabody needs to line up partners, investors and customers for the 300-megawatt plant’s energy before breaking ground. Under the proposal for what is dubbed the Mustang Energy Project, Peabody and other partners would demonstrate new technology to reduce emissions to miniscule levels. The byproducts from the pollution control effort would create enough granular fertilizer for one million acres of farmland. 

Although still in the planning stage. the Mustang project is significant because it underscores the federal government’s commitment to seed clean coal technology development. According to GE Energy, in an IGCC system coal is converted into syngas, which after cleanup is used as the primary fuel for the gas turbine in a combined-cycle system. The cleanup process  is more efficient and carries a lower cost than traditional post-combustion cleanup methods. A GE Energy spokesman says the company believes “the time is rapidly approaching for IGCC to assume a greater role in coal-based power generation.” 

Among the factors providing the momentum are:

  • Gasification has become more reliable and is already used in the petrochemical and chemical processing industries.
  • The technology is benefiting from continued advancements in natural gas turbine technology.
  • Current plant design incorporates more advanced technology and has moved beyond the mere prototype stage.
  • IGCC can be used to not only produce power from coal, but also syngas from the gasification process that can be used to produce higher-value chemicals.


Despite these positives, IGCC still contains several uncertainties. Capital costs for the plants are high. It’s not clear if state utility regulators will be willing to pass the higher costs on to ratepayers or place more of a financial burden on the utilities. 

Although IGCC technology has been around for awhile, it’s the current worldwide spike in energy prices that’s instigating a new look at the technology. If prices swoon, so could interest in IGCC and clean coal. 

Finally, while GE, Bechtel and others have grand ambitions for IGCC, much of the focus still remains in the planning stage.

Despite this, many officials believe energy industry executives need to pay close attention to the potential impact of IGCC on their businesses. “This next year is pivotal in the deal-making process for utility executives,” says Illinois Commissioner Hadley. “A lot of folks are looking at options. The time is now to start planning for energy that is going to be delivered in the next decade.”

As the energy planning process gains momentum, even much of the environmental lobby is lining up behind IGCC. David Hawkins, director of the climate sector of the National Resources Defense Council, says it would do a lot to clean up the domestic coal industry. “It’s not as clean as a natural gas plant, but it’s the cleanest you can get,” says Hawkins, adding that an estimated 120 gigawatts of new domestic coal capacity will be needed between now and 2025. With tougher rules expected to control CO2 emissions in future years, Hawkins believes it will be increasingly difficult and expensive to obtain the permits for traditional coal plants, a fact industry executives and investors have to factor in as they plan for plants that won’t be online for another 10 years. “You have to make sure any new policies in the future won’t adversely affect the financial bottom line of the plant you are planning,” he says. That alone could help swing the pendulum over to clean burning coal technologies such as IGCC.

Clean Coal

NEW WAYS TO COMBAT GLOBAL WARMING

Clean coal-burning energy technology is set to move into the industry mainstream, propelled by new technology developments, important strategic alliances and changing economic circumstances. Some energy industry executives are beginning to lay the groundwork now for a series of coal-gasification plants that would come online by 2010 and beyond. Most of these plants will utilize Integrated Gasification Combined Cycle (IGCC) technology, which combines coal gasification and combined cycle techniques to provide superior thermal efficiency and lower emissions than do traditional coal-burning plants. That could dramatically transform the coal industry’s competitive landscape and place an unexpected financial burden on utility executives tied to traditional coal-burning plants. Such facilities are less expensive to build and operate now, but they may not be by the end of the decade when new, cleaner technologies move to the coal industry’s forefront.

Utility companies, such as Cinergy, American Electric Power and others, are already getting behind IGCC, which cold provide them a strong early competitive edge if the technology meets its potential. “I’m optimistic that the time is right for IGCC,” says Bob Moreland, general manager of analytical and investment engineering for Cinergy. 

“The driver is that we think this is the way to go to build up our baseline energy capacity.” Cinergy’s PSI Energy along with General Electric Co. and Bechtel signed a letter of intent to study the feasibility of constructing an IGCC generating station that would produce 500 to 600 megawatts of energy to help meet increased demand during the next decade. The study is expected to be completed early in 2005, when a formal contract could be signed. GE and Bechtel are developing a standard commercial offering for IGCC projects in the United States. IGCC proponents view this as a key breakthrough because the standard offering will streamline the planning process, bring down costs of plant construction and minimize the financial risk of utility companies considering IGCC. Previously, the utilities had to separately arrange and contract for each phase of IGCC plant development. “The fact that GE is trying to put this together is very attractive to Cinergy,” explains Moreland. “A utility doesn’t have to buy all the bits and pieces and try to put an IGCC plant together itself.”

CLEAN COAL BENEFITS
IGCC proponents believe the technology, if successful, would reaffirm coal as the clear king of the energy landscape in the United States. They see the technology delivering economically viable, cost-efficient, environmentally sound energy for decades to come. “IGCC seems to be the best option with the most flexibility,” says David Hadley, an Indiana utility commissioner who chairs a commission exploring clean coal alternatives. “There has been a real change in thinking over the last 18 months among utility executives. They are increasingly aware of the environmental issues surrounding the use of coal. It (IGCC) is more economical than retrofitting an existing (coal) plant, potentially.”

Andrew Spahn, director of grants and research for the National Association of Regulatory Utility Commissioners, notes that more than 100 base loan unit coal plants have been planned during the next four years. He figures IGCC technology could make such plants economically and environmentally feasible because the energy produced is almost as clean as natural gas. “We are going to be building coal plants, regardless,” Spahn says. “If you can build them cleanly, it makes the economics of coal more affordable and cleans up the air.

CHANGING MARKETS
External developments also play a role in the rise of IGCC. Worldwide natural gas shortages and rising oil prices are combining to make coal a more attractive option, especially in the United States where there is an abundant supply. 

Furthermore, a clean coal-burning ICGG plant costs only between 10 and 20 percent more to build than a traditional coal plant - not terribly prohibitive when energy executives factor in likely future prohibitions on CO2 and other emissions, as well as the cost of retrofitting existing coal plants. Finally, large companies such as GE, Bechtel, Fluor, Peabody Coal and others are taking a close look at IGCC and developing a cookiecutter approach to design and engineering that is driving development costs down.

The U.S. Department of Energy, meanwhile, is pushing a Clean Coal Power Initiative to create commercial-scale demonstrations of proprietary technologies designed to improve emissions from coal-fueled electric generating plants. This is also fueling a renewed interest in clean coal. One such grant for nearly $20 million was given to Peabody Energy Corp. to build an ultra-clean $500 million coal power plant in northwestern New Mexico. 

Construction is expected to take three to four years, but Peabody needs to line up partners, investors and customers for the 300-megawatt plant’s energy before breaking ground. Under the proposal for what is dubbed the Mustang Energy Project, Peabody and other partners would demonstrate new technology to reduce emissions to miniscule levels. The byproducts from the pollution control effort would create enough granular fertilizer for one million acres of farmland. 

Although still in the planning stage. the Mustang project is significant because it underscores the federal government’s commitment to seed clean coal technology development. According to GE Energy, in an IGCC system coal is converted into syngas, which after cleanup is used as the primary fuel for the gas turbine in a combined-cycle system. The cleanup process  is more efficient and carries a lower cost than traditional post-combustion cleanup methods. A GE Energy spokesman says the company believes “the time is rapidly approaching for IGCC to assume a greater role in coal-based power generation.” 

Among the factors providing the momentum are:

  • Gasification has become more reliable and is already used in the petrochemical and chemical processing industries.
  • The technology is benefiting from continued advancements in natural gas turbine technology.
  • Current plant design incorporates more advanced technology and has moved beyond the mere prototype stage.
  • IGCC can be used to not only produce power from coal, but also syngas from the gasification process that can be used to produce higher-value chemicals.


Despite these positives, IGCC still contains several uncertainties. Capital costs for the plants are high. It’s not clear if state utility regulators will be willing to pass the higher costs on to ratepayers or place more of a financial burden on the utilities. 

Although IGCC technology has been around for awhile, it’s the current worldwide spike in energy prices that’s instigating a new look at the technology. If prices swoon, so could interest in IGCC and clean coal. 

Finally, while GE, Bechtel and others have grand ambitions for IGCC, much of the focus still remains in the planning stage.

Despite this, many officials believe energy industry executives need to pay close attention to the potential impact of IGCC on their businesses. “This next year is pivotal in the deal-making process for utility executives,” says Illinois Commissioner Hadley. “A lot of folks are looking at options. The time is now to start planning for energy that is going to be delivered in the next decade.”

As the energy planning process gains momentum, even much of the environmental lobby is lining up behind IGCC. David Hawkins, director of the climate sector of the National Resources Defense Council, says it would do a lot to clean up the domestic coal industry. “It’s not as clean as a natural gas plant, but it’s the cleanest you can get,” says Hawkins, adding that an estimated 120 gigawatts of new domestic coal capacity will be needed between now and 2025. With tougher rules expected to control CO2 emissions in future years, Hawkins believes it will be increasingly difficult and expensive to obtain the permits for traditional coal plants, a fact industry executives and investors have to factor in as they plan for plants that won’t be online for another 10 years. “You have to make sure any new policies in the future won’t adversely affect the financial bottom line of the plant you are planning,” he says. That alone could help swing the pendulum over to clean burning coal technologies such as IGCC.

Clean Coal

NEW WAYS TO COMBAT GLOBAL WARMING

Clean coal-burning energy technology is set to move into the industry mainstream, propelled by new technology developments, important strategic alliances and changing economic circumstances. Some energy industry executives are beginning to lay the groundwork now for a series of coal-gasification plants that would come online by 2010 and beyond. Most of these plants will utilize Integrated Gasification Combined Cycle (IGCC) technology, which combines coal gasification and combined cycle techniques to provide superior thermal efficiency and lower emissions than do traditional coal-burning plants. That could dramatically transform the coal industry’s competitive landscape and place an unexpected financial burden on utility executives tied to traditional coal-burning plants. Such facilities are less expensive to build and operate now, but they may not be by the end of the decade when new, cleaner technologies move to the coal industry’s forefront.

Utility companies, such as Cinergy, American Electric Power and others, are already getting behind IGCC, which cold provide them a strong early competitive edge if the technology meets its potential. “I’m optimistic that the time is right for IGCC,” says Bob Moreland, general manager of analytical and investment engineering for Cinergy. 

“The driver is that we think this is the way to go to build up our baseline energy capacity.” Cinergy’s PSI Energy along with General Electric Co. and Bechtel signed a letter of intent to study the feasibility of constructing an IGCC generating station that would produce 500 to 600 megawatts of energy to help meet increased demand during the next decade. The study is expected to be completed early in 2005, when a formal contract could be signed. GE and Bechtel are developing a standard commercial offering for IGCC projects in the United States. IGCC proponents view this as a key breakthrough because the standard offering will streamline the planning process, bring down costs of plant construction and minimize the financial risk of utility companies considering IGCC. Previously, the utilities had to separately arrange and contract for each phase of IGCC plant development. “The fact that GE is trying to put this together is very attractive to Cinergy,” explains Moreland. “A utility doesn’t have to buy all the bits and pieces and try to put an IGCC plant together itself.”

CLEAN COAL BENEFITS
IGCC proponents believe the technology, if successful, would reaffirm coal as the clear king of the energy landscape in the United States. They see the technology delivering economically viable, cost-efficient, environmentally sound energy for decades to come. “IGCC seems to be the best option with the most flexibility,” says David Hadley, an Indiana utility commissioner who chairs a commission exploring clean coal alternatives. “There has been a real change in thinking over the last 18 months among utility executives. They are increasingly aware of the environmental issues surrounding the use of coal. It (IGCC) is more economical than retrofitting an existing (coal) plant, potentially.”

Andrew Spahn, director of grants and research for the National Association of Regulatory Utility Commissioners, notes that more than 100 base loan unit coal plants have been planned during the next four years. He figures IGCC technology could make such plants economically and environmentally feasible because the energy produced is almost as clean as natural gas. “We are going to be building coal plants, regardless,” Spahn says. “If you can build them cleanly, it makes the economics of coal more affordable and cleans up the air.

CHANGING MARKETS
External developments also play a role in the rise of IGCC. Worldwide natural gas shortages and rising oil prices are combining to make coal a more attractive option, especially in the United States where there is an abundant supply. 

Furthermore, a clean coal-burning ICGG plant costs only between 10 and 20 percent more to build than a traditional coal plant - not terribly prohibitive when energy executives factor in likely future prohibitions on CO2 and other emissions, as well as the cost of retrofitting existing coal plants. Finally, large companies such as GE, Bechtel, Fluor, Peabody Coal and others are taking a close look at IGCC and developing a cookiecutter approach to design and engineering that is driving development costs down.

The U.S. Department of Energy, meanwhile, is pushing a Clean Coal Power Initiative to create commercial-scale demonstrations of proprietary technologies designed to improve emissions from coal-fueled electric generating plants. This is also fueling a renewed interest in clean coal. One such grant for nearly $20 million was given to Peabody Energy Corp. to build an ultra-clean $500 million coal power plant in northwestern New Mexico. 

Construction is expected to take three to four years, but Peabody needs to line up partners, investors and customers for the 300-megawatt plant’s energy before breaking ground. Under the proposal for what is dubbed the Mustang Energy Project, Peabody and other partners would demonstrate new technology to reduce emissions to miniscule levels. The byproducts from the pollution control effort would create enough granular fertilizer for one million acres of farmland. 

Although still in the planning stage. the Mustang project is significant because it underscores the federal government’s commitment to seed clean coal technology development. According to GE Energy, in an IGCC system coal is converted into syngas, which after cleanup is used as the primary fuel for the gas turbine in a combined-cycle system. The cleanup process  is more efficient and carries a lower cost than traditional post-combustion cleanup methods. A GE Energy spokesman says the company believes “the time is rapidly approaching for IGCC to assume a greater role in coal-based power generation.” 

Among the factors providing the momentum are:

  • Gasification has become more reliable and is already used in the petrochemical and chemical processing industries.
  • The technology is benefiting from continued advancements in natural gas turbine technology.
  • Current plant design incorporates more advanced technology and has moved beyond the mere prototype stage.
  • IGCC can be used to not only produce power from coal, but also syngas from the gasification process that can be used to produce higher-value chemicals.


Despite these positives, IGCC still contains several uncertainties. Capital costs for the plants are high. It’s not clear if state utility regulators will be willing to pass the higher costs on to ratepayers or place more of a financial burden on the utilities. 

Although IGCC technology has been around for awhile, it’s the current worldwide spike in energy prices that’s instigating a new look at the technology. If prices swoon, so could interest in IGCC and clean coal. 

Finally, while GE, Bechtel and others have grand ambitions for IGCC, much of the focus still remains in the planning stage.

Despite this, many officials believe energy industry executives need to pay close attention to the potential impact of IGCC on their businesses. “This next year is pivotal in the deal-making process for utility executives,” says Illinois Commissioner Hadley. “A lot of folks are looking at options. The time is now to start planning for energy that is going to be delivered in the next decade.”

As the energy planning process gains momentum, even much of the environmental lobby is lining up behind IGCC. David Hawkins, director of the climate sector of the National Resources Defense Council, says it would do a lot to clean up the domestic coal industry. “It’s not as clean as a natural gas plant, but it’s the cleanest you can get,” says Hawkins, adding that an estimated 120 gigawatts of new domestic coal capacity will be needed between now and 2025. With tougher rules expected to control CO2 emissions in future years, Hawkins believes it will be increasingly difficult and expensive to obtain the permits for traditional coal plants, a fact industry executives and investors have to factor in as they plan for plants that won’t be online for another 10 years. “You have to make sure any new policies in the future won’t adversely affect the financial bottom line of the plant you are planning,” he says. That alone could help swing the pendulum over to clean burning coal technologies such as IGCC.

Clean Coal

NEW WAYS TO COMBAT GLOBAL WARMING

Clean coal-burning energy technology is set to move into the industry mainstream, propelled by new technology developments, important strategic alliances and changing economic circumstances. Some energy industry executives are beginning to lay the groundwork now for a series of coal-gasification plants that would come online by 2010 and beyond. Most of these plants will utilize Integrated Gasification Combined Cycle (IGCC) technology, which combines coal gasification and combined cycle techniques to provide superior thermal efficiency and lower emissions than do traditional coal-burning plants. That could dramatically transform the coal industry’s competitive landscape and place an unexpected financial burden on utility executives tied to traditional coal-burning plants. Such facilities are less expensive to build and operate now, but they may not be by the end of the decade when new, cleaner technologies move to the coal industry’s forefront.

Utility companies, such as Cinergy, American Electric Power and others, are already getting behind IGCC, which cold provide them a strong early competitive edge if the technology meets its potential. “I’m optimistic that the time is right for IGCC,” says Bob Moreland, general manager of analytical and investment engineering for Cinergy. 

“The driver is that we think this is the way to go to build up our baseline energy capacity.” Cinergy’s PSI Energy along with General Electric Co. and Bechtel signed a letter of intent to study the feasibility of constructing an IGCC generating station that would produce 500 to 600 megawatts of energy to help meet increased demand during the next decade. The study is expected to be completed early in 2005, when a formal contract could be signed. GE and Bechtel are developing a standard commercial offering for IGCC projects in the United States. IGCC proponents view this as a key breakthrough because the standard offering will streamline the planning process, bring down costs of plant construction and minimize the financial risk of utility companies considering IGCC. Previously, the utilities had to separately arrange and contract for each phase of IGCC plant development. “The fact that GE is trying to put this together is very attractive to Cinergy,” explains Moreland. “A utility doesn’t have to buy all the bits and pieces and try to put an IGCC plant together itself.”

CLEAN COAL BENEFITS
IGCC proponents believe the technology, if successful, would reaffirm coal as the clear king of the energy landscape in the United States. They see the technology delivering economically viable, cost-efficient, environmentally sound energy for decades to come. “IGCC seems to be the best option with the most flexibility,” says David Hadley, an Indiana utility commissioner who chairs a commission exploring clean coal alternatives. “There has been a real change in thinking over the last 18 months among utility executives. They are increasingly aware of the environmental issues surrounding the use of coal. It (IGCC) is more economical than retrofitting an existing (coal) plant, potentially.”

Andrew Spahn, director of grants and research for the National Association of Regulatory Utility Commissioners, notes that more than 100 base loan unit coal plants have been planned during the next four years. He figures IGCC technology could make such plants economically and environmentally feasible because the energy produced is almost as clean as natural gas. “We are going to be building coal plants, regardless,” Spahn says. “If you can build them cleanly, it makes the economics of coal more affordable and cleans up the air.

CHANGING MARKETS
External developments also play a role in the rise of IGCC. Worldwide natural gas shortages and rising oil prices are combining to make coal a more attractive option, especially in the United States where there is an abundant supply. 

Furthermore, a clean coal-burning ICGG plant costs only between 10 and 20 percent more to build than a traditional coal plant - not terribly prohibitive when energy executives factor in likely future prohibitions on CO2 and other emissions, as well as the cost of retrofitting existing coal plants. Finally, large companies such as GE, Bechtel, Fluor, Peabody Coal and others are taking a close look at IGCC and developing a cookiecutter approach to design and engineering that is driving development costs down.

The U.S. Department of Energy, meanwhile, is pushing a Clean Coal Power Initiative to create commercial-scale demonstrations of proprietary technologies designed to improve emissions from coal-fueled electric generating plants. This is also fueling a renewed interest in clean coal. One such grant for nearly $20 million was given to Peabody Energy Corp. to build an ultra-clean $500 million coal power plant in northwestern New Mexico. 

Construction is expected to take three to four years, but Peabody needs to line up partners, investors and customers for the 300-megawatt plant’s energy before breaking ground. Under the proposal for what is dubbed the Mustang Energy Project, Peabody and other partners would demonstrate new technology to reduce emissions to miniscule levels. The byproducts from the pollution control effort would create enough granular fertilizer for one million acres of farmland. 

Although still in the planning stage. the Mustang project is significant because it underscores the federal government’s commitment to seed clean coal technology development. According to GE Energy, in an IGCC system coal is converted into syngas, which after cleanup is used as the primary fuel for the gas turbine in a combined-cycle system. The cleanup process  is more efficient and carries a lower cost than traditional post-combustion cleanup methods. A GE Energy spokesman says the company believes “the time is rapidly approaching for IGCC to assume a greater role in coal-based power generation.” 

Among the factors providing the momentum are:

  • Gasification has become more reliable and is already used in the petrochemical and chemical processing industries.
  • The technology is benefiting from continued advancements in natural gas turbine technology.
  • Current plant design incorporates more advanced technology and has moved beyond the mere prototype stage.
  • IGCC can be used to not only produce power from coal, but also syngas from the gasification process that can be used to produce higher-value chemicals.


Despite these positives, IGCC still contains several uncertainties. Capital costs for the plants are high. It’s not clear if state utility regulators will be willing to pass the higher costs on to ratepayers or place more of a financial burden on the utilities. 

Although IGCC technology has been around for awhile, it’s the current worldwide spike in energy prices that’s instigating a new look at the technology. If prices swoon, so could interest in IGCC and clean coal. 

Finally, while GE, Bechtel and others have grand ambitions for IGCC, much of the focus still remains in the planning stage.

Despite this, many officials believe energy industry executives need to pay close attention to the potential impact of IGCC on their businesses. “This next year is pivotal in the deal-making process for utility executives,” says Illinois Commissioner Hadley. “A lot of folks are looking at options. The time is now to start planning for energy that is going to be delivered in the next decade.”

As the energy planning process gains momentum, even much of the environmental lobby is lining up behind IGCC. David Hawkins, director of the climate sector of the National Resources Defense Council, says it would do a lot to clean up the domestic coal industry. “It’s not as clean as a natural gas plant, but it’s the cleanest you can get,” says Hawkins, adding that an estimated 120 gigawatts of new domestic coal capacity will be needed between now and 2025. With tougher rules expected to control CO2 emissions in future years, Hawkins believes it will be increasingly difficult and expensive to obtain the permits for traditional coal plants, a fact industry executives and investors have to factor in as they plan for plants that won’t be online for another 10 years. “You have to make sure any new policies in the future won’t adversely affect the financial bottom line of the plant you are planning,” he says. That alone could help swing the pendulum over to clean burning coal technologies such as IGCC.

Saturday, January 8, 2011

TAMBANG TERBUKA (SURFACE MINING)




TAMBANG TERBUKA (SURFACE MINING)
Merupakan satu dari dua sistem penambangan yang dikenal, yaitu Tambang terbuka dan Tambang Bawah Tanah. dimana segala kegiatan atau aktivitas penambangan dilakukan di atas atau relatif dekat permukaan bumi dan tempat kerja berhubungan langsung dengan dunia luar.
Penambangan pada tambang terbuka itu sendiri dilakukan dengan beberapa tahapan kerja : pengurusan surat-surat ijin yang dibutuhkan untuk kegiatan penambangan, pembabatan (land clearing), pengupasan lapisan tanah penutup (stripping of overburden), penambangan (exploitation), pemuatan (loading), pengangkutan (hauling), dan pengolahan serta pemasaran.

I. Pengelompokan Tambang Terbuka
Pada prinsipnya tambang terbuka dapat digolongkan ke dalam empat golongan :
1. Open pit/Open mine/Open cut/Open cast
Adalah tambang terbuka yang diterpakan pada penambangan ore (bijih). Misalnya nikel, tembaga, dan lain-lain.
2. Strip Mine
Penerapan khusus endapan horizontal/sub-horizontal terutama untuk batubara, dapat juga endapan garam yang mendatar. Contoh Tamabang Batubara di Tanjung Enim.
STRIP MINE

3. Quarry
AdalahTambang terbuka yang diterapkan pada endapan mineral industri (industrial mineral). Contoh Tambang batu pualam di Tulung Agung.
4. Alluvial mining
Dapat dikatakan sebagai “placer Mining” ataupun di Australia disebut “Beach-mine” yaitu cara penambangan untuk endapan placer atau alluvial. Contoh tambang Cassiterite di Pulau Bangka, belitung dan sekitarnya.

II. Konsiderasi Pada Operasi Penambangan
Secara garis besar, faktor-faktor yang berpengaruh terhadap kelangsungan kegiatan penambangan dibagi dalam dua kategori, yaitu faktor teknis dan faktor ekonomi.
1. Kajian Secara Teknis
Unsur unsur teknis yang perlu mendapat perhatian dalam pelaksanaan aktifitas kegiatan kerja sebuah proyek penambangan meliputi :
a. Kondisi Umum tempat proyek dilaksanakan
Kondisi Kondisi tempat kerja yang perlu diperhatikan adalah meliputi kondisi geologi, topografi, iklim dan sosial Budaya. Keadaan umum tersebut mutlak diperhitungkan guna menentukan penjadwalan waktu kegiatan dan yang utama sekali menetapkan efesiensi kerja kerja efektif dari pelaksanaan proyek tersebut
b. Sarana perlengkapan peralatan kerja
Jenis perlengkapan dan peralatan kerja disesuaikan dengan kondisi tempat kerja, maksud pekerjaaan, kapasitas produksi, dan efektifitas kerja yang diinginkan. Cara pengadaanya diperhitungkan dengan umur produksi dan efektifitas kerja dan ketersediaan modal kerja yang di miliki
c. Metode Pelaksanaan kerja
Dalam proyek ini pelaksanaan kegiatan pembongkaran material dilakukan dengan peledakan. Metode tersebut dipilih mengingat jenis materialnya memilki kekerasan yang cukup tinggi, fraksi material yang lepas yang sasaran produksinya telah ditentukan.
2. Kajian Secara Ekonomis
Kajian secara ekonomis dimaksudkan untuk mengetahui sebuah proyek penambangan memperoleh keuntungan atau tidak. Dalam perhitungan aliran uang diperhatikan beberapa faktor yang berpengaruh dalam situasi ekonomi.
Hal-hal yang diperhatikan tersebut adalah:
1. Nilai (value) daripada endapan mineral per unit berat (P). dan biasanya dinyatakan dengan ($/ton) atau (Rp/ton)
2. Ongkos produksi (C), yaitu ongkos yang diperlukan sampai mendapatkan produknya diluar ongkos stripping.
3. Ongkos stripping of overburden (Cob), yaitu dinyatakan dengan persamaan berikut :
Cob =
4. Cut Off Grade, akan menentukan batas-batas cadangan sehingga menentukan bentuk akhir penambangan.
III. Aktifitas Pertambangan Pada Tambang Terbuka
A. Tahap Persiapan
Kegiatan – kegiatan yang dilakukan pada awal proses pengambilan atau penambangan bahan galian terdiri dari tahap persiapan (pra penambangan), Kegiatan tersebut meliputi :

1. Pembuatan Jalan Rintasan
Jalan rintasan berfungsi sebagai jalur lewatnya alat – alat berat ke lokasi tambang, kemudian dikembangkan sebagai jalan angkut material dari front penambangan ke lokasi pabrik peremukan. Pembuatan jalan diguna-kan dengan memakai Bulldozer yang nantinya digunakan pula sebagai pengupasan lapisan penutup.

2. Pembersihan Lahan
Pekerjaan ini dilakukan sebelum tahap pengupasan lapisan tanah penutup dimulai. Pekerjaan ini meliputi pembabatan dan pengumpulan pohon yang tumbuh pada permukaan daerah yang akan ditambang dengan tujuan untuk membersihkan daerah tambang tersebut sehingga kegiatan penambangan dapat dilakukan dengan mudah tanpa harus terganggu dengan adanya gangguan tetumbuhan yang ada didaerah penambangan. Kegiatan pembersihan ini dilakukan dengan menggunakan Bulldozer.
Pembersihan dilakukan pada daerah yang akan ditambang yang mempunyai ketebalan overburden beberapa meter dengan menggunakan Bulldozer dan dilakukan secara bertahap sesuai dengan pengupasan lapisan tanah penutup. Dalam pembabatan, pohon didorong kearah bawah lereng untuk dikumpulkan, dimana penanganan selanjutnya diserahkan pada penduduk setempat.

3. Pengupasan Tanah Penutup
Pembuangan lapisan tanah penutup dimaksudkan untuk membersihkan endapan batu gamping yang akan digali dari semua macam pengotor yang menutupi permukaanya, sehingga akan mempermudah pekerjaan penggaliannya disamping juga hasilnya akan relatif lebih bersih.
Lapisan tanah penutup pada daerah proyek terdiri atas dua jenis yaitu top soil dan lapisan overburden sehingga lapisan dilakukan terhadap lapisan top soil terlebih dahulu dan ditempatkan pada suatu daerah tertentu untuk tujuan reklamasi nantinya. Setelah lapisan top soil terkupas, selanjutnya dilakukan pengupasan pada lapisan overburden lalu didorong dan ditempatkan pada daerah tertentu dan sebagian lagi digunakan sebagai pengeras jalan.
Kegiatan pengupasan dilakukan secara bertahap dengan menggunakan bulldozer, dimana tahap pengupasan awal dilakukan untuk menyiapkan jenjang pertama dan pengupasan berikutnya dapat dilakukan bersamaan dengan tahap produksi, sehingga pola yang diterapkan adalah seri dan paralel yang bertujuan untuk :
a. Menghemat investasi dan biaya persiapan
b. Menghindari pengotoran endapan batu gamping dari lapisan penutup, sehingga mempermudah dalam pekerjaan penggalian.
c. Menghindari terjadinya longsoran dan bahaya angin.

4. Persiapan Peralatan Penambangan
Penambangan yang akan dilakukan difokuskan dengan menggunakan peralatan mekanis. Adapun alat yang digunakan diperlukan untuk menunjang kegiatan penambangan, yaitu :
a. Bulldozer, yang digunakan untuk pembersihan lahan dan pengupasan lapisan tanah penutup.
b. Loader, yang digunakan untuk memuat bongkahan batu gamping hasil dari pembongkaran keatas alat angkut.
c. Truck, yang digunakan sebagai alat angkut hasil front penambangan ke tempat pabrik peremukan/penggerusan.
d. Crushing Plant, yaitu suatu unit pengolahan yang berfungsi sebagai alat preparasi batu gamping dari front penambangan guna mendapatkan ukuran butiran yang diinginkan oleh pasar.
e. Pembangkit Listrik, berfungsi sebagai sumber tenaga listrik yang akan dipakai sebagai penerangan, untuk alat pengolahan dan menggerakkan alat – alat yang bekerja didalam pabrik.
f. Pompa Air, digunakan untuk memompa atau mengambil air guna memenuhi kebutuhan peralatan dan karyawan.

5. Persiapan Pabrik Peremukan
Pabrik peremukan ini harus dibuat cukup luas agar dapat menampung material hasil penambangan sebelum proses peremukan.
a. Pemilihan Lokasi Peremukan dan Stock Pile
Pemilihan lokasi biasanya bedasarkan topografi daerahnya yang agak landai . Lokasi pabrik dipilih daerah yang relatif datar dan tanpa vegetasi sehingga hanya perlu proses atau pekerjaan perataan seperlunya saja. dan dekat dengan Infrastruktur yang ada seperti jalan, dan penerangan.
b. Pemasangan Peralatan pada Pabrik Peremuk
Untuk penempatan mesin peremuk dibutuhkan pondasi yang cukup kuat agar dapat bertahan cukup lama sesuai dengan proyek yang diselenggarakan dan masalah konstruksi pondasi diborongkan kepada pihak kontraktor dengan pihak pemasok mesin peremuk sebagai konsultan.
c. Letak Kantor
Sarana perkantoran digunakan sebagai pusat pengaturan dan pelaksanaan kegiatan kerja penambangan dan direncanakan berada pada daerah yang mudah dicapai dan dekat dengan jalan masuk. Bangunan ini dibuat permanen karena dipakai dalam jangka waktu yang sangat lama sesuai dengan umur proyek.
d. Pusat Perawatan Alat
Dalam menunjang kelancaran operasi dibutuhkan peralatan – peralatan yang selalu dalam kondisi yang baik dan siap pakai. Untuk itu sangat dibutuhkan suatu sarana sebagai tempat perawatan peralatan (spare part), agar perawatan terhadap peralatan atau mesin – mesin yang digunakan dapat dilakukan secara rutin baik itu dalam jenis perawatan yang ringan maupun pergantiaan suku cadangnya.
e. Penerangan
Sarana penerangan dimaksudkan untuk memberikan penerangan disekitar bangunan, jalan, dan terutama sekali didalam kegiatan penunjang kerja. Sumber listrik untuk penerangan ini tidak menjadi satu dengan listrik untuk pabrik, sehingga khusus untuk sarana penerangan ini diperlukan sebuah generator.
f. SumberAir
Air merupakan sumber sarana yang sangat vital bagi sebuah proyek yang melibatkan banyak tenaga kerja. Disamping air digunakan sebagai kebutuhan sehari – hari, air juga dipakai dalam kegiatan penambangan yang didapat dari air tanah dengan melakukan pemboran.
g. Prasarana Penunjang Lainnya
Yang dimaksud dengan prasarana lain disini adalah prasarana yang dipakai untuk kepentingan umum dimana selain digunakan oleh perusahaan juga dapat dipakai oleh masyarakat setempat sehingga mempunyai dampak yang positip terhadap kehidupan masyarakat sekitar. Prasarana lainnya meliputi saran olahraga, saran tempat peribadatan, poliklinik, power house, dan pos keamanan.

B. Operasi Penambangan
Tujuan utama dari kegiatan penambangan adalah pengambilan endapan dari batuan induknya, sehingga mudah untuk diangkut dan di proses pada proses selanjutnya selanjutnya.
Setelah operasi persiapan penambangan selesai dan pengupasan lapisan tanah penutup pada bagian atas cadangan batugamping terlaksana (arah kemajuan penambangan dari kontur atas ke bawah). Maka dapat dimulai kegiatan operasi penambangan.
Kegiatan penambangan terbagi atas tiga kegiatan, yaitu pembongkaran, pemuatan dan pengangkutan. Adapun rincian dari ketiga kegiatan tersebut adalah:

1. Pembongkaran
Pembongkaran merupakan kegiatan untuk memisahkan antara endapan bahan galian dengan batuan induk yang dilakukan setelah pengupasan lapisan tanah penutup endapan batugamping tersebut selesai. Pembongkaran dapat dilakukan dengan menggunakan peledakan, peralatan mekanis maupun peralatan non mekanis.
Untuk kegiatan pembongkaran batugamping menggunakan pemboran yang kemudian dilakukan peledakan. setelah batuan diledakkan kemudian digusur menggunakan alat bulldozer, yang kemudian dikumpulkan di tepi batas penambangan atau tepi jalan tambang tiap blok. Banyaknya batugamping yang dibongkar tiap-tiap blok tidak sama, tergantung persyaratan kualitas yang diminta oleh konsumen.

2. Pemuatan
Pemuatan adalah kegiatan yang dilakukan untuk memasukkan atau mengisikan material atau endapan bahan galian hasil pembongkaran ke dalam alat angkut. Kegiatan pemuatan dilakukan setelah kegiatan penggusuran, pemuatan dilakukan dengan menggunakan alat muat Wheel Loader dan diisikan ke dalam alat angkut.
Kegiatan pemuatan bertujuan untuk memindahkan batugamping hasil pembongkaran kedalam alat angkut. Pengangkutan dilakukan dengan sistem siklus, artinya truck yang telah dimuati langsung berangkat tanpa harus menunggu truck yang lain dan setelah membongkar muatan langsung kembali ke lokasi penambangan untuk dimuati kembali

3. Pengangkutan
Pengangkutan adalah kegiatan yang dilakukan untuk mengangkut atau membawa material atau endapan bahan galian dari front penambangan dibawa ke tempat pengolahan untuk proses lebih lanjut.
Kegiatan pengangkutan menggunakan Dump Truck yang kemudian dibawa ke tempat pengolahan untuk dilakukan proses peremukan (crushing), jumlah truk yang akan digunakan tergantung dari banyaknya material batugamping hasil peledakan yang akan diangkut.

C. Pengolahan Dan Pemasaran

1. Pengolahan
Adalah kegiatan yang bertujuan untuk menaikkan kadar atau mempertinggi mutu bahan galian yang dihasilkan dari tambang sampai memenuhi persyaratan untuk diperdagangkan atau dipakai sebagai bahan baku untuk bahan industri lain.
Bahan galian yang dihasilkan dari tambang biasanya selain mengandung mineral berharga yang diingikan juga mengandung mineral pengotor (gangue mineral) sehingga hasil tambang tidak bisa langsung dimanfaatkan atau diperdagangkan. Untuk menghilangkan mineral pengotor tersebut sehingga hasil tambang dapat dimanfaatkan atau diperdagangkan, maka dilakukan dengan pengolahan bahan galian ( ore/mineral dressing). Proses pemisahan pemisahan antara mineral berharga dengan mineral-mineral pengotor didasarkan kepada perbedaan baik fisik maupun sifat kimia antara mineral berharga dengan mineral pengotornya.
Keuntungan lain dari pengolahan bahan galian selain meningkatkan kadar mutunya. Ialah juga untuk mengurangi jumlah volume dan beratnya sehingga dapat mengurangi jumlah volume dan beratnya sehingga dapat mengurangi ongkos pengangkutannya.

2. Pemasaran
Pemasaran adalah kegiatan yang bertujuan untuk menjual suatu produk kepada para pemakai produk atau konsumen dengan harga yang telah ditentukan atau berdasarkan atas perjanjian antara kedua belah pihak yang bersangkutan. Kegiatan pemasaran dilakukan setelah kegiatan pengolahan atau setelah syarat-syarat yang telah ditentukan oleh konsumen terhadap mutu produk terpenuhi.

D. Reklamasi
Reklamasi merupakan pekerjaan-pekerjaan yang bertujuan untuk memperbaiki atau mengembalikan tata lingkungan hidup agar lebih berdaya guna. Usaha ini harus dilakukan setiap pengusaha (pengusaha pertambangan) sesuai peraturan pemerintah yang berlaku.
Dalam pelaksanaannya ada beberapa kesulitan untuk reklamasi daerah bekas tambang apabila tanpa perencanaan pengelolaan yang baik. Kesulitan tersebut antara lain :
1. Tidak dilakukannya pengamatan terhadap tanah humus sehingga dalam pelaksanaannya baanyak tanah humus yang terbuang.
2. Tidak dilakukannya dengan tuntas sehingga terdapat bekas daerah tambang yang dibiarkan terbuka untuk beberapa lama karena ada sebagian tanah galian masih tersisa.
3. Kesulitan penentuan lokasi penimbunan tanah penutup.
Beberapa faktor penting yang saling mempengaruhi lingkungan dari kegiatan pertambangan antara lain penerapan teknologi pertambangan. Kegiatan faktor ini saling berpengaruh bukan hanya pada lingkungan diluar pertambangan dimana daya dukung menjadi berkurang, akan tetapi kegiatan penambangan akan mengalami hambatan dalam kelancaran operasinya.
Reklamasi didaerah bekas tambang dilakukan dengan cara pengambilan kembali tanah penutup (top soil) ke bekas daerah penambangan kemudian dilakukan pemupukan tanah untuk mengembalikan kestabilan dan kesuburan tanah. Sehingga dapat ditanami tanaman yang lebih produktif bagi penduduk setempat, agar tata lingkungan tidak jauh berbeda dengan lingkungan sebelumnya maka dipilih bibit mahoni sebagai tanaman reklamasi.
Kegiatan reklamasi akan dilakukan setelah kegiatan penambangan selesai, dalam hal ini setelah penambangan pada suatu daerah selesai dilaksanakan, dengan urutan kegiatan sebagai berikut :
1. Pengupasan lapisan tanah penutup (top soil) dilaksanakan
2. Lapisan tanah penutup (top soil) tersebut dikumpulkan pada suatu tempat
3. Kegiatan penambangan dan pengolahan
4. Tailing dari proses pengolahan dimasukkan kembali pada blok yang telah ditambang.
5. Perataan tinggi daerah penambangan dengan daerah sekelilingnya yang tidak ditambang
6. Penyebaran lapisan tanah penutup (top soil)
7. Penanaman dengan tanaman keras yang cocok dengan daerah tersebut

Friday, January 7, 2011

ALAT - ALAT BERAT DAN PRINSIP KERJA



TRAKTOR
Fungsi dari crawler traktor :
1. sebagai tenaga penggerak untuk mendorong dan menarik beban.
2. sebagai tenaga penggerak untuk winch dan alat angkut.
3. sebagai tenaga penggerak blade (bulldozer).
4. sebagai tenaga penggerak front-end bucket.
5. sebagai alat penarik scrapper .
6. untuk pengerjaan ripping.

BULLDOZER
Fungsi dari bulldozer :
1. membersihkan medan dari kayu-kayuan,tonggak-tonggak pohon dan batu-batuan.
2. pembukaan jalan kerja di pegunungan maupun pada daerah yang berbatu-batu.
3. memindahkan tanah yang jauhnya hingga 300 ft.
4. menarik scraper.
5. menghamparkan tanah irisan atau urugan
6. menimbun kembali trencher.
7. membersihkan medan.
8. pemeliharaan jalan kerja.
9. menyiapkan material-material dari soil borrow pit dan quarry pit atau tempat pengambilan material.
10. sebagai alat gali, alat angkut dan alat dorong.

DUMP TRUCK
Alat angkut ini banyak dipakai untuk mengangkut : tanah, endapan bijih, batuan untuk bangunan dll. Pada jarak yang dekat dan sedang. Karena kecepatannya yang tinggi maka truk mempunyai produksi yang tinggi, sehingga ongkos per ton material menjadi rendah.selain itu dump truck juga fleksibel, artinya dapat dipakai untuk mengangkut bermacam-macam barang yang mempunyai bentuk dan jumlah yang beraneka ragam pula., dan tidak terlalu tergantung pada jalur jalan .

BELT CONVEYOR
Belt coveyer dapat digunakan untuk mengangkut material baik yang berupa unit load atau bulk material secara mendatar ataupun miring, yang dimaksud dengan unit load adalah benda yang biasanya dapat dihitung jumlahnya satu-persatu.misalnya balok kantong dan lain sebagainya. Sedangkan bulk material adalah material yang berupa butir-butir bubuk atau serbuk misalnya : pasir,semen dan batu bara. Fungsi belt comveyer adalah untuk membawa material yang diangkut dari lokasi penambangan. Belt dapat dibuat dari berbagai macam bahan, yaitu lapis tenunan benang kapas yang tebal yang biasanya membentuk carcass.

BACKHOE
Bagian bagian utama dari backhoe :
1. bagian atas revolving unit (bias berputar )
2. bagian bawah travel unit ( bias berjalan )
3. bagian attachment yang dapat diganti.
Backhoe dikhususkan untuk penggalian yang letaknya dibawah backhoe itu sendiri .
Backhoe dapat berfungsi sebagai alat gali yang mempunyai tingkat kedalaman yang lebih teliti, juga dapat digunakan sebagai alat pemuat bagi truck truck.

A. Alat Gali Muat
BULLDOZER
Bulldozer merupakan alat dorong yang paling umum digunakan dapat juga dikategorikan sebagai alat gali-angkut jarak pendek.
Kemampuan Bulldozer antara lain :
a. Membabat atau menebas
b. Merintis (pioneering)
Untuk pembuatan jalan dilereng bukit, maka ada dua kemungkinan :
1. Bulldozer dapat naik keatas bukit lalu dibuat jalan dari sebelah atas.
2. Bila tidak mungkin harus dibuat dari bawah.
c. Gali angkut jarak pendek
Yaitu menggali lalu mendorong tanah galian itu kesuatu tempat tertentu, misalnya pada pembuatan jalan raya, saluran/kanal agar alat muat lebih mudah bekerja.
d. Pusher Loading
Yaitu membantu “scraper” dalam mengisi muatannya pada lapisan tanah kohesif.
e. Menyebarkan Material (Spreading)
Maksudnya menyebarkan material tanah ketempat-tempat tertentu dengan tebal yang dikehendaki.
f. Menimbun Kembali (Backfilling)
Yaitu pekerjaan penimbunan kembali terhadap bekas lubang-lubang galian.
g. Trimming and Sloping
Yaitu pekerjaan pembuatan kemiringan tertentu pada suatu tempat, seperti : tanggul, dam, kanal-kanal besar, tepi jalan raya, dsb.
h. Ditching
Yaitu menggali selokan atau kanal yang berbentuk V atau U.

EXCAVATOR
Berdasarkan cara pengendalian/pemuatannya, Excavator digolongkan dalam dua tipe yaitu front shovel (penggalian dengan mangkuk mengarah kedepan) dan Back hoe (penggalaian dengan mangkuk mengarah kebelakang).

TRACKLOADER DAN WHEELLOADER
Trackloader adalah alat gali-muat dengan menggunakan ban rantai sedangkan wheel loader adalah alat gali-muat dengan menggunakan ban karet.
Berdasarkan cara penggalian/pemuatannya baik trackloader ataupun wheel loader tergolong frontshovel.

DUMP TRUCK
Banyak dipakai untuk mengangkut : tanah, batuan untuk bangunan, dll pada jarak dekat dan sedang. Karena kecepatannya yang tinggi (kalau jalan baik), maka dump truck memiliki kapasitas tinggi sehingga ongkos angkut per ton material rendah. Kecuali itu juga flexible yaitu dapat digunakan untuk mengangkut bermacam-macam barang dengan muatan yang berubah-ubah dan tidak terlalu tergantung pada jalur jalan (bandingkan dengan lori atau belt conveyer).
Alat ini dapat digerakkan dengan motor bensin, disel, butane atau propane. Yang besar-besar biasanya digerakkan oleh mesin diesel. Kemiringan jalan yang dapat dilalui maksimum hingga 35 % (efektif 17 – 18 %).
Penggolongan Dump Truck
a. Berdasarkan tenaga penggerak “drive”
- Front wheel drive (tenaga penggerak pada roda depan), lambat dan lekas aus bannya.
- Rear wheel drive (tenaga penggerak pada roda belakang), merupakan tipe yang paling umum digunakan.
- For wheel drive (tenaga penggerak pada roda depan dan belakang).
- Double Rear wheel drive (tenaga penggerak pada dua pasang roda belakang).
b. Berdasarkan cara dumping
- End-dump : mengosongkan muatan kebelakang.
- Side-dump : mengosongkan muatan kesamping
- Bottom-dump : mengosongkan muatan kebawah.
Bodynya terbuat dari baja yang kuat, berkapasitas anatara 5-40 ton, sekarang 150 ton.
Pemilihan tergantung dari keadaan tempat kerja, artinya tergantung dari keadaan dan letak tempat pembuangan material (dump site).
Mengenai cara pemilihan ukuran dump truck memang agak sukar menentukannya. Akan tetapi sebagai pegangan dapat dikatakan bahwa kapasitas minimum dari dump truck kira-kira 4 – 5 kali kapasitas alat penggalinya (power shovel atau dragline).
Keuntungan memakai dump truck yang kecil kapasitasnya adalah :
1. Lebih mudah menggerakkan kekanan dan kekiri.
2. Lebih cepat dan ringan tak lekas merusak ban dan jalan.
3. Kalau macet satu, kemerosotan produksi kecil.
4. Lebih mudah menyesuaikan dengan kapasitas alat galinya.
Kerugiannnya adalah :
1. Sukar mengisinya karena kecil jadi lebih lama “spooting time” nya.
2. Lebih banyak pengemudi “maintenance”, “spare part” yang diperlukan untk kapasitas yang sama.
3. Mesinnya sering memakai bahan baker yang mahal.

BELT CONVEYOR
Belt conveyor dapat digunakan untuk mengengkut material baik yang berupa “unit load” atau “bulk material” secara mendatar ataupun miring.
Ynag dimaksud dengan “unit load” adalah benda yang biasanya dapat dihitung jumlahnya satu per satu, misalnya kotak, kantong, balok dll. Sedangkan Bulk Material adalah material yang berupa butir-butir, bubuk atau serbuk, misalnya pasir, semen dll.
Bagian – bagian terpenting Belt conveyor adalah :
a. Belt
Fungsinya adalah untuk membawa material yang diangkut.
b. Idler
Gunanya untuk menahan atau menyangga belt.
Menurut letak dan fungsinya maka idler dibagi menjadi :
1. Idler atas yang digunakan untuk menahan belt yang bermuatan.
2. Idler penahan yaitu idler yang ditempatkan ditempat pemuatan.
3. Idler penengah yaitu yang dipakai untuk menjajaki agar belt tidak bergeser dari jalur yang seharusnya.
4. Idler bawah Idler balik yaitu yang berguna untuk menahan belt kosong.
c. Centering Device
Untuk mencegah agar belt tidak meleset dari rollernya.
d. Unit Penggerak (drive units)
Pada Belt conveyor tenaga gerak dipindahkan ke belt oleh adanya gesekan antara belt dengan “plulley” penggerak (drive pully), karena belt melekat disekeliling pully yang diputar oleh motor.
e. Pemberat (take-ups or counter weight)
Yaitu komponen untuk mengatur tegangan belt dan untuk mencegah terjadinya selip antara belt dengan pully penggerak, karena bertambah panjangnya belt.
f. Bending the belt
Alat yang dipergunakan untuk melengkungkan belt adalah
- Pully terakhir atau pertengahan
- Susunan Roller-roller
- Beban dan adanya sifat kelenturan belt.
g. Pengumpan (feeder)
Adalah alat untuk pemuatan material keatas belt dengan kecepatan teratur.
h. Trippers
Adalah alat untuk menumpahkan muatan disuatu tempat tertentu.
i. pembersih Belt (belt-cleaner)
Yaitu alat yang dipasang di bagian ujung bawah belt agar material tidak melekat pada belt balik.
j. Skirts
Adalah semacam sekat yang dipasang dikiri kanan belt pada tempat pemuatan (loading point) yang gterbuat dari logam atau kayun dan dapat dipasang tegak atau miring yang gunanya untuk mencegah terjadinya ceceran.
k. Holdback
Adalah suatu alat untuk mencegah agar Belt conveyor yang membawa muatan keatas tidak berputar kembali kebawah jika tenaga gerak tiba-tiba rusak atau dihentikan.
l. Kerangka (frame)
Adalah konstruksi baja yang menyangga seluruh susunan belt conveyor dan harus ditempatkan sedemikian rupa sehingga jalannya belt yang berada diatasnya tidak terganggu.
m. Motor Penggerak
Biasanya dipergunakan motor listrik untuk menggerakkan drive pulley. Tenaga (HP) dari motor harus disesuaikan dengan keperluan, yaitu :
1. Menggerakkan belt kosong dan mengatasi gesekan-gesekan anatara idler dengan komponen lain.
2. Menggerakkan muatan secara mendatar.
3. Mengankut muatan secara tegak (vertical).
4. Menggerakkan tripper dan perlengkapan lain.
5. Memberikan percepatan pada belt yang bermuatan bila sewaktu-waktu diperlukan.

BATUBARA



Batubara
Batubara adalah bahan bakar fosil. Batubara dapat terbakar, terbentuk dari endapan, batuan organik yang terutama terdiri dari karbon, hidrogen dan oksigen. Batubara terbentuk dari tumbuhan yang telah terkonsolidasi antara strata batuan lainnya dan diubah oleh kombinasi pengaruh tekanan dan panas selama jutaan tahun sehingga membentuk lapisan batubara.

Pembentukan Batubara
Komposisi batubara hampir sama dengan komposisi kimia jaringan tumbuhan, keduanya mengandung unsur utama yang terdiri dari unsur C, H, O, N, S, P. Hal ini dapat dipahami, karena batubara terbentuk dari jaringan tumbuhan yang telah mengalami coalification. Pada dasarnya pembentukkan batubara sama dengan cara manusia membuat arang dari kayu, perbedaannya, arang kayu dapat dibuat sebagai hasil rekayasa dan inovasi manusia, selama jangka waktu yang pendek, sedang batubara terbentuk oleh proses alam, selama jangka waktu ratusan hingga ribuan tahun. Karena batubara terbentuk oleh proses alam, maka banyak parameter yang berpengaruh pada pembentukan batubara. Makin tinggi intensitas parameter yang berpengaruh makin tinggi mutu batubara yang terbentuk.
Ada dua teori yang menjelaskan terbentuknya batubara, yaitu teori insitu dan teori drift. Teori insitu menjelaskan, tempat dimana batubara terbentuk sama dengan tempat terjadinya coalification dan sama pula dengan tempat dmana tumbuhan tersebut berkembang.

Teori drift menjelaskan, bahwa endapan batubara yang terdapat pada cekungan sedimen berasal dari tempat lain. Bahan pembentuk batubara mengalami proses transportasi, sortasi dan terakumulasi pada suatu cekungan sedimen. Perbedaan kualitas batubara dapat diketahui melalui stratigrafi lapisan. Hal ini mudah dimengerti karena selama terjadi proses transportasi yang berkaitan dengan kekuatan air, air yang besar akan menghanyutkan pohon yang besar, sedangkan saat arus air mengecil akan menghanyutkan bagian pohon yang lebih kecil (ranting dan daun). Penyebaran batubara dengan teori drift memungkinkan, tergantung dari luasnya cekungan sendimentasi.
Pada proses pembentukan batubara atau coalification terjadi proses kimia dan fisika, yang kemudian akan mengubah bahan dasar dari batubara yaitu selulosa menjadi lignit, subbitumina, bitumina atau antrasit. Reaksi pembentukkannya dapat diperlihatkan sebagai berikut:

5(C6H10O5)  C20H22O4 + 3CH4 + 8H2O + 6CO2 + CO

Selulosa lignit gas metan
Dalam proses pembentukkan selulosa sebagai senyawa organik yang merupakan senyawa pembentuk batubara, semakin banyak unsur C pada batubara, maka semakin baik kualitasnya, sebaliknya semakin banyak unsur H, maka semakin rendah kualitasnya, dan senyawa kimia yang terbentuk adalah gas metan, semakin besar kandungan gas metan, maka semakin baik kualitasnya.
Klasifikasi Batubara
Menurut American Society for Testing Material (ASTM), secara umum batubara digolongkan menjadi 4 berdasarkan kandungan unsur C dan H2O yaitu: anthracite, bituminous coal, sub bituminous coal, lignite dan peat (gambut).

a. Anthracite
Warna hitam, sangat mengkilat, kompak, kandungan karbon sangat tinggi, kandungan airnya sedikit, kandungan abu sangat sedikit, kandungan sulfur sangat sedikit.

b. Bituminous/subbituminous coal
Warna hitam mengkilat, kurang kompak, kandungan karbon relative tinggi, nilai kalor tinggi, kandungan air sedikit, kandungan abu sedikit, kandungan sulfur sedikit.
c. Lignite
Warna hitam, sangat rapuh, kandungan karbon sedikit, nilai kalor rendah, kandungan air tinggi, kandungan abu banyak, kandungan sulfur banyak.

Kualitas Batubara
Batubara yang diperoleh dari hasil penambangan mengandung bahan pengotor (impurities). Hal ini bisa terjadi ketika proses coalification ataupun pada proses penambangan yang dalam hal ini menggunakan alat-alat berat yang selalu bergelimang dengan tanah. Ada dua jenis pengotor yaitu:

a. Inherent impurities
Merupakan pengotor bawaan yang terdapat dalam batubara. Batubara yang sudah dibakar memberikan sisa abu. Pengotor bawaan ini terjadi bersama-sama pada proses pembentukan batubara. Pengotor tersebut dapat berupa gybsum (CaSO42H2O), anhidrit (CaSO4), pirit (FeS2), silica (SiO2). Pengotor ini tidak mungkin dihilangkan sama sekali, tetapi dapat dikurangi dengan melakukan pembersihan.

b. Eksternal impurities
Merupakan pengotor yang berasal dari uar, timbul pada saat proses penambangan antara lain terbawanya tanah yang berasal dari lapisan penutup.
Sebagai bahan baku pembangkit energi yang dimanfaatkan industri, mutu batubara mempunyai peranan sangat penting dalam memilih peralatan yang akan dipergunakan dan pemeliharaan alat. Dalam menentukan kualitas batubara perlu diperhatikan beberapa hal, antara lain:

a. Heating Value (HV) (calorific value/Nilai kalori)
Banyaknya jumlah kalori yang dihasilkan oleh batubara tiap satuan berat dinyatakan dalam kkal/kg. semakin tingi HV, makin lambat jalannya batubara yang diumpankan sebagai bahan bakar setiap jamnya, sehingga kecepatan umpan batubara perlu diperhatikan. Hal ini perlu diperhatikan agar panas yang ditimbulkan tidak melebihi panas yang diperlukan dalam proses industri.

b. Moisture Content (kandungan lengas).
Lengas batubara ditentukan oleh jumlah kandungan air yang terdapat dalam batubara. Kandungan air dalam batubara dapat berbentuk air internal (air senyawa/unsur), yaitu air yang terikat secara kimiawi.
Jenis air ini sulit dihilangkan tetapi dapat dikurangi dengan cara memperkecil ukuran butir batubara. Jenis air yang kedua adalah air eksternal, yaitu air yang menempel pada permukaan butir batubara. Batubara mempunyai sifat hidrofobik yaitu ketika batubara dikeringkan, maka batubara tersebut sulit menyerap air, sehingga tidak akan menambah jumlah air internal.

c. Ash content (kandungan abu)
Komposisi batubara bersifat heterogen, terdiri dari unsur organik dan senyawa anorgani, yang merupakan hasil rombakan batuan yang ada di sekitarnya, bercampur selama proses transportasi, sedimentasi dan proses pembatubaraan. Abu hasil dari pembakaran batubara ini, yang dikenal sebagai ash content. Abu ini merupakan kumpulan dari bahan-bahan pembentuk batubara yang tidak dapat terbaka atau yang dioksidasi oleh oksigen. Bahan sisa dalam bentuk padatan ini antara lain senyawa SiO2, Al2O3, TiO3, Mn3O4, CaO, Fe2O3, MgO, K2O, Na2O, P2O, SO3, dan oksida unsur lain.

d. Sulfur Content (Kandungan Sulfur)
Belerang yang terdapat dalam batubara dibedakan menjadi 2 yaitu dalam bentuk senyawa organik dan anorganik. Beleranga dalam bentuk anorganik dapat dijumpai dalam bentuk pirit (FeS2), markasit (FeS2), atau dalam bentuk sulfat. Mineral pirit dan makasit sangat umum terbentuk pada kondisi sedimentasi rawa (reduktif). Belerang organik terbentuk selama terjadinya proses coalification. Adanya kandungan sulfur, baik dalam bentuk organik maupun anorganik di atmosfer dipicu oleh keberadaan air hujan, mengakibatkan terbentuk air asam. Air asam ini dapat merusak bangunan, tumbuhan dan biota lainnya.

II.2. Pemanfaatan Batubara
Batubara merupakan sumber energi dari bahan alam yang tidak akan membusuk, tidak mudah terurai berbentuk padat. Oleh karenanya rekayasa pemanfaatan batubara ke bentuk lain perlu dilakukan.
Pemanfataan yang diketahui biasanya adalah sebagai sumber energi bagi Pembangkit Listrik Tenaga Uap Batubara, sebagai bahan bakar rumah tangga (pengganti minyak tanah) biasanya dibuat briket batubara, sebagai bahan bakar industri kecil; misalnya industri genteng/bata, industri keramik. Abu dari batubara juga dimanfaatkan sebagai bahan dasar sintesis zeolit, bahan baku semen, penyetabil tanah yang lembek. Penyusun beton untuk jalan dan bendungan, penimbun lahan bekas pertambangan,; recovery magnetit, cenosphere, dan karbon; bahan baku keramik, gelas, batu bata, dan refraktori; bahan penggosok (polisher); filler aspal, plastik, dan kertas; pengganti dan bahan baku semen; aditif dalam pengolahan limbah (waste stabilization).
Ada beberapa faktor yang menadi alasan batubara digunakan sebagai sumber energi alternatif, yaitu:
1. Cadangan batubara sangat banyak dan tersebar luas. Diperkirakan terdapat lebih dari 984 milyar ton cadangan batubara terbukti (proven coal reserves) di seluruh dunia yang tersebar di lebih dari 70 negara.
2. Negara-negara maju dan negara-negara berkembang terkemuka memiliki banyak cadangan batubara.
3. Batubara dapat diperoleh dari banyak sumber di pasar dunia dengan pasokan yang stabil.
4. Harga batubara yang murah dibandingkan dengan minyak dan gas.
5. Batubara aman untuk ditransportasikan dan disimpan.
6. Batubara dapat ditumpuk di sekitar tambang, pembangkit listrik, atau lokasi sementara.
7. Teknologi pembangkit listrik tenaga uap batubara sudah teruji dan handal.
8. Kualitas batubara tidak banyak terpengaruh oleh cuaca maupun hujan.
9. Pengaruh pemanfaatan batubara terhadap perubahan lingkungan sudah dipahami dan dipelajari secara luas, sehingga teknologi batubara bersih (clean coal technology) dapat dikembangkan dan diaplikasikan.
II.3. Gasifikasi Batubara
Gasifikasi batubara adalah sebuah proses untuk mengubah batubara padat menjadi gas batubara yang mudah terbakar (combustible gases), setelah proses pemurnian gas-gas karbon monoksida (CO), karbon dioksida (CO2), hidrogen (H), metan (CH4), dan nitrogen (N2) akhirnya dapat digunakan sebagai bahan bakar. Hanya menggunakan udara dan uap air sebagai reacting gas kemudian menghasilkan water gas atau coal gas, gasifikasi secara nyata mempunyai tingkat emisi udara, kotoran padat dan limbah terendah.
Untuk melangsungkan gasifikasi diperlukan suatu suatu reaktor. Reaktor tersebut dikenal dengan nama gasifier. Ketika gasifikasi dilangsungkan, terjadi kontak antara bahan bakar dengan medium penggasifikasi di dalam gasifier. Kontak antara bahan bakar dengan medium tersebut menentukan jenis gasifier yang digunakan. Secara umum pengontakan bahan bakar dengan medium penggasifikasinya pada gasifier dibagi menjadi tiga jenis, yaitu entrained bed, fluidized bed, dan fixed/moving bed.