Wednesday, January 6, 2010
ROM Handling Guide
Does P2H and cheque dumping before doing activity loading in ROM
Applies lable as general as at unit loader and hauler
Eliminates soon potency's “contamination” in each unit operating in ROM
At above case, soon does cutting with cutter !!
Does P2H in units working in ROM area
Does treatment of bedding coal and basement ROM comprehensively and more intensified at situation of the rains
Does keeping of drainage and super of elevation of ROM comprehensively
Does treatment of drainage and fine coal trap ROM comprehensively and more intensified at the rains
Does sweeping of lag metal component in ROM periodical with magnetic sweeper
Avoids !
1. Water pond in ROM
2. Bedding damage coal
3. Drainage is stuffing up
4. Basement damage ROM material
Exhaust soon fine coal heaping in ROM area
Prohibited firm to do heaping at location basement damage ROM
Dissociates heaping of coal in ROM as according to its(the specification
Does circulation of coal furnish by applying principle First In First Out
Does heaping of coal in ROM with height of maximum 5 metre
Does crushing of Big coal if it is found in ROM
Informs soon to pit or to QC if it is found this thing
Does evacuating contamination material from rom stockpile
Barricade ribbon berry in the area
Does admission filling or loading coal 90% from boat volume with unit loader (WL or excavator)
Does fireplace of boat charge by using fireplace specialized unit
Build observation post in every outlet ROM
Ascertains existence of supervisor in every active ROM
Install enough lighting in every active ROM
Labels:
COAL