Coal Mining Sebamban
Indonesia earth simply to save so much once natural resources is including coal energy resource. Kalimantan and Sumatra is island with the biggest coal producer in Indonesia. From strarting small industry (ceramics, tile, textile) until big industry like PLTU and cement factory applies coal as component of burning.
Sebamban is part of region Kecamatan Kuranji Kabupaten Tanah Bumbu Kalimantan Selatan, from banjarmasin is gone through with journey of land toward smooth stone ± 5 hour. This area topography hill and dale by cultivated trees of acacia which is including Hutan Tanaman Industri. So do with plantation of oil palm which almost flattens all this region.
Activity of coal mining included in region Sebamban VI Kecamatan Kuranji Blok B, started with making of road(street hauling towards base camp mine along the length of 2,3 kms. Making activity of this hauling road(street covers making of drainage through the street, Bridge from acacia wood and accumulation of road(street with material claystone and laterite. Making of road hauling is done by means of ... excavator PC 200-7 and Dozer D85-ESS and requires time ± 4 month of considering weather with high rainfall and condition of equipment where its Mechanical Availability under 75%.
Phase hereinafter is making of base camp mines for mess, office, warehouse, workshop which required time ± 3 month. After construction work completed equipment excavator PC 200-7 and Dozer D85-ESS does making activity of stockpile mine with a width of 3/4 Ha and making of road(street hauling from mine to stockpile and preparation disposal. Making activity of this hauling road(street covers making of drainage through the street, Bridge from acacia wood and accumulation of road with material clay stone and laterite.
Phase hereinafter is land clearing for areal which would in mine is continued with work of O/B Removal covering dig, loading and